FAS Research Computing - Notishistorik

Upplever delvis försämrad prestanda

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Försämrad prestanda

SLURM Scheduler - Cannon - Försämrad prestanda

Cannon Compute Cluster (Holyoke) - Försämrad prestanda

Boston Compute Nodes - Försämrad prestanda

GPU nodes (Holyoke) - Försämrad prestanda

seas_compute - Försämrad prestanda

I drift

SLURM Scheduler - FASSE - I drift

FASSE Compute Cluster (Holyoke) - I drift

I drift

Kempner Cluster CPU - I drift

Kempner Cluster GPU - I drift

I drift

FASSE login nodes - I drift

I drift

Cannon Open OnDemand - I drift

FASSE Open OnDemand - I drift

I drift

Netscratch (Global Scratch) - I drift

Home Directory Storage - Boston - I drift

Tape - (Tier 3) - I drift

Holylabs - I drift

Isilon Storage Holyoke (Tier 1) - I drift

Holystore01 (Tier 0) - I drift

HolyLFS04 (Tier 0) - I drift

HolyLFS05 (Tier 0) - I drift

HolyLFS06 (Tier 0) - I drift

Holyoke Tier 2 NFS (new) - I drift

Holyoke Specialty Storage - I drift

holECS - I drift

Isilon Storage Boston (Tier 1) - I drift

BosLFS02 (Tier 0) - I drift

Boston Tier 2 NFS (new) - I drift

CEPH Storage Boston (Tier 2) - I drift

Boston Specialty Storage - I drift

bosECS - I drift

Samba Cluster - I drift

Globus Data Transfer - I drift

Notishistorik

sep. 2025

aug. 2025

SMB access to shares on the FASRC samba cluster)
  • Löst
    Löst

    SMB access has been restored. Please disconnect and retry if you have a failed mapped drive. If you still cannot connect to a share, please contact rchelp@rc.fas.harvard.edu and let us know your username and exactly which share you are attempting to map.

  • Identifierat
    Identifierat

    We are continuing to work on a fix for this incident. No ETA.

  • Undersöker
    Undersöker

    Drive mapping to some shares may fail if those shares use the Samba Cluster. This includes but is not limited to share paths that begin with \\smbip.

    Known affected shares:

    anderson_lab

    arlotta_lab

    bellono_lab

    bertoldi_lab c

    apellini_lab

    dasch14

    dasch15

    dasch16

    denic_lab

    dobbie_lab

    engert_lab

    ferreira_lab

    fortune_lab

    friedman_lab

    girguis_lab

    grad_lab

    hausmann_lab

    hays_lab

    hbs_liran

    hbs_rcs huh

    illumina

    jessicacohen_lab

    lichtman_boslfs02

    mallet_lab

    mason_lab

    mckinley_lab

    mcz

    mitrano_lab

    moorcroftfs5

    murraylab

    nmr_large

    nmr_small

    novitsky_lab

    pooling

    qbrc_center

    ramachandran_lab

    schnapp_lab

    schrag_lab

    srivastava_lab

    whited_lab

    yau2_lab

juli 2025

FASRC Monthly maintenance July 7, 2025 9AM-1PM
  • Slutfört
    juli 07, 2025 kl 17:00
    Slutfört
    juli 07, 2025 kl 17:00
    Maintenance has completed successfully
  • Pågår
    juli 07, 2025 kl 13:00
    Pågår
    juli 07, 2025 kl 13:00
    Maintenance is now in progress
  • Planerat
    juli 07, 2025 kl 13:00
    Planerat
    juli 07, 2025 kl 13:00

    FASRC monthly maintenance will take place Monday July 7th, 2025 from 9am-1pm

    NOTICES

    • ​New Quota tool available (/usr/local/sbin/quota) - Works on all filesystem types (home directory, lustre, isilon, netscratch, etc.)
      Type quota -h to see the full instructions for usage o visit the usage doc.

    • Training: Upcoming training from FASRC and other sources can be found on our Training Calendar. at https://www.rc.fas.harvard.edu/upcoming-training/

    • Status Page: You can subscribe to our status to receive notifications of maintenance, incidents, and their resolution at https://status.rc.fas.harvard.edu/ (click Get Updates for options).

    • Upcoming holidays:​ Juneteenth - ​T​hur. June 19​ / Independence Day - Fri​. July 4

    MAINTENANCE TASKS
    Cannon cluster will be paused during this maintenance?: YES
    FASSE cluster will be paused during this maintenance?: YES

    • Slurm Upgrade to 24.11.5

      • Audience: All cluster users

      • Impact: Jobs and the scheduler will be paused during this upgrade

    • Login node ​OS ​upgrades

      • Audience: Anyone logged into a FASRC Cannon or FASSE login node

      • Impact: All login nodes will ​upgraded ​and unavailable during this maintenance window

    • ​Start of cluster OS upgrades - July 7 -10

      • Audience: All cluster users

      • Impact: Over 4 days, July 7 through 10, we will upgrade the OS on 25% of the cluster each day. During that time, total capacity will be reduced across the cluster by 1/4 each day. This will require draining each sub-set of nodes ahead of time. 

    • Netscratch cleanup ( https://docs.rc.fas.harvard.edu/kb/policy-scratch/ )

      • Audience: Cluster users

      • Impact: Files older than 90 days will be removed. Please note that retention cleanup can and does run at any time, not just during the maintenance window.

    Thank you,
    FAS Research Computing
    https://docs.rc.fas.harvard.edu/
    https://www.rc.fas.harvard.edu/

Rolling cluster OS upgrades July 7 - 10
  • Slutfört
    juli 11, 2025 kl 16:02
    Slutfört
    juli 11, 2025 kl 16:02

    All upgrades are complete. A small number of nodes need clean-up, but the cluster is back to normal operation with all nodes running Rocky 8.10. Thanks for your patience.

  • Uppdatering
    juli 07, 2025 kl 13:00
    Uppdatering
    juli 07, 2025 kl 13:00

    Cannon rolling upgrades are in progress. Not all nodes are available.

    https://www.rc.fas.harvard.edu/blog/2025-compute-os-upgrade/

  • Pågår
    juli 07, 2025 kl 13:00
    Pågår
    juli 07, 2025 kl 13:00

    UPDATE: 7/7/25 6M FASSE is operational.

    Please be aware that FASSE jobs cannot be launched at this time due to the upgrades.
    We will return all FASSE nodes to normal services as soon as possible.

    https://www.rc.fas.harvard.edu/blog/2025-compute-os-upgrade/

  • Planerat
    juli 07, 2025 kl 13:00
    Planerat
    juli 07, 2025 kl 13:00

    Cluster OS upgrades - July 7 -10

    • Audience: All cluster users

    • Impact: Over 4 days, July 7 through 10, we will upgrade the OS on 25% of the cluster each day.
      During that time, total capacity will be reduced across the cluster by 1/4 each day.
      This will require draining each sub-set of nodes ahead of time. 

    Work begins during the July 7th maintenance (login nogdes will be upgraded during the 7/7 maintenance window) and will continue through July 10th.

    Additional details and a breakdown of each phase: 2025 Compute OS Upgrade

juli 2025 till sep. 2025

Nästa