FAS Research Computing - Зверніть увагу на історію
Відчувається часткове зниження продуктивності
Status page for the Harvard FAS Research Computing cluster and other resources.
Cluster Utilization (VPN and FASRC login required): Cannon | FASSE
Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).
The colors shown in the bars below were chosen to increase visibility for color-blind visitors. For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.
SMB access has been restored. Please disconnect and retry if you have a failed mapped drive. If you still cannot connect to a share, please contact rchelp@rc.fas.harvard.edu and let us know your username and exactly which share you are attempting to map.
Визначено
Визначено
We are continuing to work on a fix for this incident. No ETA.
Вивчається
Вивчається
Drive mapping to some shares may fail if those shares use the Samba Cluster. This includes but is not limited to share paths that begin with \\smbip.
FASRC monthly maintenance will take place Monday July 7th, 2025 from 9am-1pm
NOTICES
New Quota tool available (/usr/local/sbin/quota) - Works on all filesystem types (home directory, lustre, isilon, netscratch, etc.) Type quota -h to see the full instructions for usage o visit the usage doc.
Status Page: You can subscribe to our status to receive notifications of maintenance, incidents, and their resolution at https://status.rc.fas.harvard.edu/ (click Get Updates for options).
Upcoming holidays: Juneteenth - Thur. June 19 / Independence Day - Fri. July 4
MAINTENANCE TASKS Cannon cluster will be paused during this maintenance?: YES FASSE cluster will be paused during this maintenance?: YES
Slurm Upgrade to 24.11.5
Audience: All cluster users
Impact: Jobs and the scheduler will be paused during this upgrade
Login node OS upgrades
Audience: Anyone logged into a FASRC Cannon or FASSE login node
Impact: All login nodes will upgraded and unavailable during this maintenance window
Start of cluster OS upgrades - July 7 -10
Audience: All cluster users
Impact: Over 4 days, July 7 through 10, we will upgrade the OS on 25% of the cluster each day. During that time, total capacity will be reduced across the cluster by 1/4 each day. This will require draining each sub-set of nodes ahead of time.
Impact: Files older than 90 days will be removed. Please note that retention cleanup can and does run at any time, not just during the maintenance window.
All upgrades are complete. A small number of nodes need clean-up, but the cluster is back to normal operation with all nodes running Rocky 8.10. Thanks for your patience.
Оновлювати
липня 07, 2025 у 13:00
Оновлювати
липня 07, 2025 у 13:00
Cannon rolling upgrades are in progress. Not all nodes are available.
Please be aware that FASSE jobs cannot be launched at this time due to the upgrades. We will return all FASSE nodes to normal services as soon as possible.
Impact: Over 4 days, July 7 through 10, we will upgrade the OS on 25% of the cluster each day. During that time, total capacity will be reduced across the cluster by 1/4 each day. This will require draining each sub-set of nodes ahead of time.
Work begins during the July 7th maintenance (login nogdes will be upgraded during the 7/7 maintenance window) and will continue through July 10th.