FAS Research Computing - お知らせ履歴

全システムが稼働中

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

稼働中

SLURM Scheduler - Cannon - 稼働中

Cannon Compute Cluster (Holyoke) - 稼働中

Boston Compute Nodes - 稼働中

GPU nodes (Holyoke) - 稼働中

seas_compute - 稼働中

稼働中

SLURM Scheduler - FASSE - 稼働中

FASSE Compute Cluster (Holyoke) - 稼働中

稼働中

Kempner Cluster CPU - 稼働中

Kempner Cluster GPU - 稼働中

稼働中

FASSE login nodes - 稼働中

稼働中

Cannon Open OnDemand - 稼働中

FASSE Open OnDemand - 稼働中

稼働中

Netscratch (Global Scratch) - 稼働中

Home Directory Storage - Boston - 稼働中

Tape - (Tier 3) - 稼働中

Holylabs - 稼働中

Isilon Storage Holyoke (Tier 1) - 稼働中

Holystore01 (Tier 0) - 稼働中

HolyLFS04 (Tier 0) - 稼働中

HolyLFS05 (Tier 0) - 稼働中

HolyLFS06 (Tier 0) - 稼働中

Holyoke Tier 2 NFS - 稼働中

Holyoke Specialty Storage - 稼働中

holECS - 稼働中

Isilon Storage Boston (Tier 1) - 稼働中

BosLFS02 (Tier 0) - 稼働中

Boston Tier 2 NFS - 稼働中

CEPH Storage Boston (Tier 2) - 稼働中

Boston Specialty Storage - 稼働中

bosECS - 稼働中

Samba Cluster - 稼働中

Globus Data Transfer - 稼働中

5月 2024

5月29
NESE Tape unavailable due to maintenance, ETA now Monday
解決済みメンテナンス117時間 55分
  • 解決済みUTC

    NESE maintenance has resolved and is now back in service

  • 監視中UTC

    A note from NESE. Their maintenance has been delayed by hardware issues. ETA now Monday 6/3

    Dear All,

    NESE Tape system upgrade is currently in progress. While IBM hardware
    team works on TS4500 library tape frame expansion and IBM software team
    works on ESS and Archive software and firmware upgrades, the work
    progress has been slowed down due to unforeseen hardware issues.We now expect to bring the tape service back into production this Monday
    morning. We apologize for any inconvenience caused by the delay.

  • 原因判明済みUTC

    Due to maintenance at our tape partner, NESE (Northeast Storage Exchange), access to tape allocations will be unavailable until at least late Thursday (5/30). Normal operations will resume by Friday (5/31).

    If you continue to have issues with a Globus tape endpoint on Friday, please contact FASRC or NESE

5月21
Annual MGHPCC/Holyoke data center power downtime - May 21-24 2024
完了メンテナンス80時間 50分
  • 完了5月 24, 2024 の 21:50UTC

    2024 MGHPCC downtime complete

    DOWNTIME COMPLETE

    The annual multi-day power downtime at MGHPCC (https://www.rc.fas.harvard.edu/blog/2024-mghpcc-power-downtime/) is complete (with any exceptions noted below). Normal service resumes today (Friday May 24th) at 5pm.

    The cluster has been updated to Rocky Linux 8.9. Several network, InfiniBand, computer, and storage firmware updates were installed. Available security updates were also installed.

    CANNON NODES

    More than 90% of nodes are up and all partitions are enabled. If your specialty partition has a downed node, we will attend to this on Tuesday.

    FASSE OOD

    Some updates are still propagating. If your FASSE Open OnDemand/VDI session does not work initially, please wait or retry your job/session.

    POST-DOWNTIME SUPPORT

    If you have any further concerns or unanswered questions please submit a help ticket (https://portal.rc.fas.harvard.edu/rcrt/submit_ticket) and we will do our best to respond quickly. Please bear in mind it is a long weekend, so lingering issues may not be dealt with until Tuesday.

    Also, have a good long Memorial Day weekend!

    Thanks,

    FAS Research Computing

    https://www.rc.fas.harvard.edu/

    https://docs.rc.fas.harvard.edu/

    https://status.rc.fas.harvard.edu/

    rchelp@rc.fas.harvard.edu  

  • 更新5月 24, 2024 の 21:08UTC

    We are currently delayed opening the cluster due to some lingering issues.

    We will re-open as soon as possible or update again at 6pm.

  • 更新5月 24, 2024 の 13:47UTC

    Power work completed by facility. Currently on schedule for powerup and return to service. ETA 5pm.

  • 進行中5月 21, 2024 の 13:00UTC
    Maintenance is now in progress
  • 予定5月 21, 2024 の 13:00UTC

    The 2024 MGHPCC data center annual power downtime will take place May 21-24, 2024.

    We will begin our shutdown on Tuesday May 21st and expect a return to service by 5PM Friday May 24th.

    - Jobs: Please plan ahead as all still running jobs on the morning of May 21st will be stopped and canceled and will need to be resubmitted after the downtime. Pending jobs will remain in the queue until the cluster returns to regular service on May 24th.

    - Access: The cluster, scheduler, login, and OoD nodes will be unavailable for the duration of the downtime. New lab and account requests should wait until after the downtime.

    - Storage: All Holyoke storage will be powered down and unavailable for the duration of the downtime. Boston storage will remain online, but your ability to access it may be impacted and network changes may briefly affect its availability.

    Further details, an explanation for this year's change in scheduling, a visual timeline, and a list of maintenance tasks overview can be found at:

    https://www.rc.fas.harvard.edu/blog/2024-mghpcc-power-downtime/

    Progress of the downtime will be posted here on our status page during the event. Note that you can subscribe to receive updates as they happen. Click Get Updates in the upper right.

    MAJOR TASK OVERVIEW

    • OS upgrade to Rocky 8.9 - Point upgrade, no code rebuilds will be required. Switch from system OFED to Mellanox OFED on nodes for improved performance

    • Infiniband (network) upgrades

    • BIOS updates (various)

    • Storage firmware updates

    • Network Maintenance

    • Decommission old nodes (targets contacted)

    • Additional minor one-off updates and maintenance (cable swap, reboots, etc.)

    Thanks,

    FAS Research Computing

    https://www.rc.fas.harvard.edu/

    https://docs.rc.fas.harvard.edu/

    https://status.rc.fas.harvard.edu/

Many nodes in 8A down - affects sapphire, test, bigmem, and other partitions
解決済み13時間 13分
  • 解決済みUTC
    This incident has been resolved.
  • 調査中UTC

    We are still unable to resolve the issue with these nodes and are working with the facility, networking, and our staff to find a solution. The affected partitions (noted in previous update below) will be resource-constrained and continue to be slow or unable to queue new jobs.


    If you are using a partition that cannot queue new jobs, please consider adding additional partitions to your job: https://docs.rc.fas.harvard.edu/kb/running-jobs/#Slurm_partitions

    Also, a reminder that the data center power downtime will begin Tuesday morning. So any new jobs scheduled for more than 3 days will not complete: https://www.rc.fas.harvard.edu/blog/2024-mghpcc-power-downtime/

  • 原因判明済みUTC

    We are still working on the root cause and resolution for these downed nodes.

    Partitions with one or more affected nodes [involves multiple nodes unless denoted as (1) ]:

    arguelles_delgado_gpu (1)

    hsph

    joonholee

    jshapiro_sapphire

    lichtmandce01

    bigmem

    gpu_requeue (1)

    intermediate

    sapphire

    serial_requeue (1)

    shared (1)

    test

    yao / yao_priority

    use 'sinfo -p [partition name]' if you wish to see the down nodes in particular queue

  • 調査中UTC

    We are currently investigating this incident. An unknown outage has downed many nodes in row 8A of our data center. More information to follow.

    Includes nodes from the sapphire, test, gpu, and other partitions.

4月 2024

3月 2024

FASRC maintenance update - All jobs requeued (Cannon and FASSE)
解決済み5時間 23分
  • 解決済みUTC
    This incident has been resolved.
  • 監視中UTC

    Informational Notice

    The Slurm upgrade to 23.11.4 was completed successfully during maintenance. However a complication with the automation of Slurm's cryptographic keys occurred during the upgrade which caused nodes to lose the ability to talk to the Slurm master. The Slurm master therefore viewed those nodes as down and requeued their jobs.

    All jobs on Cannon and FASSE were requeued.

    This is deeply regrettable but the chain of events which caused this could not be foreseen.

    To check the status of your jobs, see the common Slurm commands at:

    https://docs.rc.fas.harvard.edu/kb/convenient-slurm-commands/#Information_on_jobs

    FAS Research Computing

    https://docs.rc.fas.harvard.edu/

    rchelp@rc.fas.harvard.edu

前へ

3月 2024 ~ 5月 2024

次へ