FAS Research Computing - அறிவிப்பு வரலாறு

அனைத்து சேவைகளும் இயங்குகின்றன

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

இயங்குகிறது

SLURM Scheduler - Cannon - இயங்குகிறது

Cannon Compute Cluster (Holyoke) - இயங்குகிறது

Boston Compute Nodes - இயங்குகிறது

GPU nodes (Holyoke) - இயங்குகிறது

seas_compute - இயங்குகிறது

இயங்குகிறது

SLURM Scheduler - FASSE - இயங்குகிறது

FASSE Compute Cluster (Holyoke) - இயங்குகிறது

இயங்குகிறது

Kempner Cluster CPU - இயங்குகிறது

Kempner Cluster GPU - இயங்குகிறது

இயங்குகிறது

FASSE login nodes - இயங்குகிறது

இயங்குகிறது

Cannon Open OnDemand - இயங்குகிறது

FASSE Open OnDemand - இயங்குகிறது

இயங்குகிறது

Netscratch (Global Scratch) - இயங்குகிறது

Home Directory Storage - Boston - இயங்குகிறது

Tape - (Tier 3) - இயங்குகிறது

Holylabs - இயங்குகிறது

Isilon Storage Holyoke (Tier 1) - இயங்குகிறது

Holystore01 (Tier 0) - இயங்குகிறது

HolyLFS04 (Tier 0) - இயங்குகிறது

HolyLFS05 (Tier 0) - இயங்குகிறது

HolyLFS06 (Tier 0) - இயங்குகிறது

Holyoke Tier 2 NFS (new) - இயங்குகிறது

Holyoke Specialty Storage - இயங்குகிறது

holECS - இயங்குகிறது

Isilon Storage Boston (Tier 1) - இயங்குகிறது

BosLFS02 (Tier 0) - இயங்குகிறது

Boston Tier 2 NFS (new) - இயங்குகிறது

CEPH Storage Boston (Tier 2) - இயங்குகிறது

Boston Specialty Storage - இயங்குகிறது

bosECS - இயங்குகிறது

Samba Cluster - இயங்குகிறது

Globus Data Transfer - இயங்குகிறது

அறிவிப்பு வரலாறு

மே 2025

MGHPCC power work 5/21 - 5/23 - Some partitions will be at half capacity
  • முடிந்தது
    மே 23, 2025 இல் பிற்பகல் 7:00UTC
    முடிந்தது
    மே 23, 2025 இல் பிற்பகல் 7:00UTC
    Maintenance has completed successfully
  • முன்னேற்றத்தில் உள்ளது
    மே 21, 2025 இல் முற்பகல் 11:00UTC
    முன்னேற்றத்தில் உள்ளது
    மே 21, 2025 இல் முற்பகல் 11:00UTC
    Maintenance is now in progress
  • திட்டமிடப்பட்டது
    மே 21, 2025 இல் முற்பகல் 11:00UTC
    திட்டமிடப்பட்டது
    மே 21, 2025 இல் முற்பகல் 11:00UTC

    The MGHPCC Holyoke data center will be performing power work on May 21st -23rd. This work will take out one half (or one 'side') of the power capacity for certain rows/racks including our compute rows. Because of our power draw, one side is not enough power to keep each full rack running.

    As such, we will be adding a reservation to idle half the nodes in the partitions listed below. A reservation will cause nodes to drain as jobs complete and stop scheduling new jobs on those nodes if they cannot be completed before the outage. This will allow us to idle and power down those nodes prior to the work and avoid potential blackout/brownout on those racks.

    This will mean that these partitions will be up and available, but that half the nodes from each will be down (assuming an even number of nodes).

    This work is part of an on-going power capacity upgrade at MGHPCC. We expect this will be the last power work needed and the facility will then provide enough additional power for future expansion as well adding overhead for the current load.

    The affected partitions are:

    • arguelles_delgado

    • bigmem_intermediate

    • blackhole_gpu

    • eddy gershman

    • hejazi

    • hernquist

    • hoekstra

    • huce_ice

    • iaifi_gpu

    • iaifi_gpu_requeue

    • iaifi_priority

    • jshapiro

    • jshapiro_priority

    • kempner

    • kempner_requeue

    • kempner_h100

    • kempner_h100_priority

    • kempner_h100_priority2

    • kovac kozinsky

    • kozinsky_gpu

    • kozinsky_requeue

    • ortegahernandez_ice

    • rivas

    • seas_compute

    • seas_gpu

    • siag_combo

    • siag_gpu

    • sur

    • zhuang

ஏப். 2025

Login nodes temporarily down
  • தீர்க்கப்பட்டது
    UTC
    தீர்க்கப்பட்டது

    Cannon boslogin and FASSE login nodes are back up and operational.

    All holylogin nodes are still down for repair, please see our posted incident for more updates: https://status.rc.fas.harvard.edu/cm97gyay90013dturk7fxg5pb

    We apologize for the unexpected disruption.

  • விசாரிக்கப்படுகிறது
    UTC
    விசாரிக்கப்படுகிறது

    Due to a configuration error, all cluster login nodes are rebooting and are temporarily unavailable. Please save any work immediately.

holylogin[05-08] down
  • தீர்க்கப்பட்டது
    UTC
    தீர்க்கப்பட்டது
    Hardware has been repaired and holyoke login nodes are back online. Thanks for your patience.
  • கண்காணிக்கப்படுகிறது
    UTC
    கண்காணிக்கப்படுகிறது

    Holylogin chassis repair during maintenance was unsuccessful and replacement parts have been ordered.

    • holyoke login nodes (holylogin05-08) are down for hardware repair

    • Only Boston login nodes available (ie, boslogin[05-08])

    If you have holylogin hard-coded in your scripts, please update to login.rc.fas.harvard.edu or boslogin.rc.fas.harvard.edu for the time being, which will redirect you to an available login node.

    As always, the best method for obtaining a login node is usinglogin.rc.fas.harvard.edu which will pick a node for you.

    If you require a login node in a specific data center, use boslogin.rc.fas.harvard.edu (Boston) or (once they are back in service) holylogin.rc.fas.harvard.edu (Holyoke).

    See also: Command line access with Terminal (login nodes) – FASRC DOCS

  • தீர்க்கப்பட்டது
    UTC
    தீர்க்கப்பட்டது

    This incident was posted by mistake.

    holylogin01-04 were replaced by holylogin05-08 some time back.

    As always, the best method for obtaining a login node is usinglogin.rc.fas.harvard.edu which will pick a node for you.

    Or if you require a login node in a specific data center, use boslogin.rc.fas.harvard.edu (Boston) or holylogin.rc.fas.harvard.edu (Holyoke).

    See also: Command line access with Terminal (login nodes) – FASRC DOCS

  • விசாரிக்கப்படுகிறது
    UTC
    விசாரிக்கப்படுகிறது

    Holylogin chassis repair during maintenance was unsuccessful and replacement parts have been ordered.

    Audience:

    • All cluster users

    Impact:

    • All holylogin** servers will be down till further notice

    • Only Boston login nodes available (ie, boslogin[05-08])

    If you have holylogin hard-coded in your scripts, please update to login.rc.fas.harvard.edu or boslogin.rc.fas.harvard.edu for the time being, which will redirect you to an available login node.

    Updates to follow as we have them.

மார். 2025

FASRC monthly maintenance - Monday March 3rd, 2025 from 9am-1pm
  • புதுப்பிப்பு
    மார்ச் 03, 2025 இல் பிற்பகல் 6:00UTC
    புதுப்பிப்பு
    மார்ச் 03, 2025 இல் பிற்பகல் 6:00UTC
    Maintenance has completed successfully
  • முடிந்தது
    மார்ச் 03, 2025 இல் பிற்பகல் 6:00UTC
    முடிந்தது
    மார்ச் 03, 2025 இல் பிற்பகல் 6:00UTC
    Maintenance has completed successfully
  • முன்னேற்றத்தில் உள்ளது
    மார்ச் 03, 2025 இல் பிற்பகல் 2:00UTC
    முன்னேற்றத்தில் உள்ளது
    மார்ச் 03, 2025 இல் பிற்பகல் 2:00UTC
    Maintenance is now in progress
  • திட்டமிடப்பட்டது
    மார்ச் 03, 2025 இல் பிற்பகல் 2:00UTC
    திட்டமிடப்பட்டது
    மார்ச் 03, 2025 இல் பிற்பகல் 2:00UTC

    PLEASE NOTE - New time window going forward - 9am-1pm

    FASRC monthly maintenance will take place Monday March 3rd, 2025 from 9am-1pm

    NOTICES

    • Training: Upcoming training from FASRC and other sources can be found on our Training Calendar. at https://www.rc.fas.harvard.edu/upcoming-training/

    • Status Page: You can subscribe to our status to receive notifications of maintenance, incidents, and their resolution at https://status.rc.fas.harvard.edu/ (click Get Updates for options).

    • Upcoming holidays: Memorial Day - Monday, May 26

    • You can subscribe to our status page using the Get Updates button in the upper right

    MAINTENANCE TASKS
    Cannon cluster will be paused during this maintenance?: YES
    FASSE cluster will be paused during this maintenance?: YES

    • Slurm Upgrade to 24.11.2 - Crucial Update

      • Audience: All cluster users

      • Impact: Jobs and the scheduler will be paused during this upgrade

    • Open Ondemand (OOD) reboots

      • Audience: All OOD users

      • Impact: All Open OnDemand (aka OOD/VDI/RCOOD) nodes will be rebooted

    • Login node reboots

      • Audience: Anyone logged into a FASRC Cannon or FASSE login node

      • Impact: Login nodes will rebooted during this maintenance window

    • bos-Isilon firmware updates

      • Audience: bos-isilon users

      • Impact: No noticeable impact for storage users

    • Netscratch retention/cleanup ( https://docs.rc.fas.harvard.edu/kb/policy-scratch/ )

      • Audience: Cluster users

      • Impact: Files older than 90 days will be removed. Please note that retention cleanup can and does run at any time, not just during the maintenance window.

    Thank you,
    FAS Research Computing
    https://www.rc.fas.harvard.edu/
    https://docs.rc.fas.harvard.edu/

மார். 2025 வரை மே 2025

அடுத்து