FAS Research Computing - Observați istoricul

Toate sistemele operaționale

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Operațional

SLURM Scheduler - Cannon - Operațional

Cannon Compute Cluster (Holyoke) - Operațional

Boston Compute Nodes - Operațional

GPU nodes (Holyoke) - Operațional

seas_compute - Operațional

Operațional

SLURM Scheduler - FASSE - Operațional

FASSE Compute Cluster (Holyoke) - Operațional

Operațional

Kempner Cluster CPU - Operațional

Kempner Cluster GPU - Operațional

Operațional

FASSE login nodes - Operațional

Operațional

Cannon Open OnDemand - Operațional

FASSE Open OnDemand - Operațional

Operațional

Netscratch (Global Scratch) - Operațional

Home Directory Storage - Boston - Operațional

Tape - (Tier 3) - Operațional

Holylabs - Operațional

Isilon Storage Holyoke (Tier 1) - Operațional

Holystore01 (Tier 0) - Operațional

HolyLFS04 (Tier 0) - Operațional

HolyLFS05 (Tier 0) - Operațional

HolyLFS06 (Tier 0) - Operațional

Holyoke Tier 2 NFS (new) - Operațional

Holyoke Specialty Storage - Operațional

holECS - Operațional

Isilon Storage Boston (Tier 1) - Operațional

BosLFS02 (Tier 0) - Operațional

Boston Tier 2 NFS (new) - Operațional

CEPH Storage Boston (Tier 2) - Operațional

Boston Specialty Storage - Operațional

bosECS - Operațional

Samba Cluster - Operațional

Globus Data Transfer - Operațional

Observați istoricul

mai 2025

MGHPCC power work 5/21 - 5/23 - Some partitions will be at half capacity
  • Finalizat
    mai 23, 2025 la 19:00UTC
    Finalizat
    mai 23, 2025 la 19:00UTC
    Maintenance has completed successfully
  • În curs
    mai 21, 2025 la 11:00UTC
    În curs
    mai 21, 2025 la 11:00UTC
    Maintenance is now in progress
  • Plănuit
    mai 21, 2025 la 11:00UTC
    Plănuit
    mai 21, 2025 la 11:00UTC

    The MGHPCC Holyoke data center will be performing power work on May 21st -23rd. This work will take out one half (or one 'side') of the power capacity for certain rows/racks including our compute rows. Because of our power draw, one side is not enough power to keep each full rack running.

    As such, we will be adding a reservation to idle half the nodes in the partitions listed below. A reservation will cause nodes to drain as jobs complete and stop scheduling new jobs on those nodes if they cannot be completed before the outage. This will allow us to idle and power down those nodes prior to the work and avoid potential blackout/brownout on those racks.

    This will mean that these partitions will be up and available, but that half the nodes from each will be down (assuming an even number of nodes).

    This work is part of an on-going power capacity upgrade at MGHPCC. We expect this will be the last power work needed and the facility will then provide enough additional power for future expansion as well adding overhead for the current load.

    The affected partitions are:

    • arguelles_delgado

    • bigmem_intermediate

    • blackhole_gpu

    • eddy gershman

    • hejazi

    • hernquist

    • hoekstra

    • huce_ice

    • iaifi_gpu

    • iaifi_gpu_requeue

    • iaifi_priority

    • jshapiro

    • jshapiro_priority

    • kempner

    • kempner_requeue

    • kempner_h100

    • kempner_h100_priority

    • kempner_h100_priority2

    • kovac kozinsky

    • kozinsky_gpu

    • kozinsky_requeue

    • ortegahernandez_ice

    • rivas

    • seas_compute

    • seas_gpu

    • siag_combo

    • siag_gpu

    • sur

    • zhuang

apr 2025

Login nodes temporarily down
  • Rezolvat
    UTC
    Rezolvat

    Cannon boslogin and FASSE login nodes are back up and operational.

    All holylogin nodes are still down for repair, please see our posted incident for more updates: https://status.rc.fas.harvard.edu/cm97gyay90013dturk7fxg5pb

    We apologize for the unexpected disruption.

  • În curs de investigare
    UTC
    În curs de investigare

    Due to a configuration error, all cluster login nodes are rebooting and are temporarily unavailable. Please save any work immediately.

holylogin[05-08] down
  • Rezolvat
    UTC
    Rezolvat
    Hardware has been repaired and holyoke login nodes are back online. Thanks for your patience.
  • În curs de monitorizare
    UTC
    În curs de monitorizare

    Holylogin chassis repair during maintenance was unsuccessful and replacement parts have been ordered.

    • holyoke login nodes (holylogin05-08) are down for hardware repair

    • Only Boston login nodes available (ie, boslogin[05-08])

    If you have holylogin hard-coded in your scripts, please update to login.rc.fas.harvard.edu or boslogin.rc.fas.harvard.edu for the time being, which will redirect you to an available login node.

    As always, the best method for obtaining a login node is usinglogin.rc.fas.harvard.edu which will pick a node for you.

    If you require a login node in a specific data center, use boslogin.rc.fas.harvard.edu (Boston) or (once they are back in service) holylogin.rc.fas.harvard.edu (Holyoke).

    See also: Command line access with Terminal (login nodes) – FASRC DOCS

  • Rezolvat
    UTC
    Rezolvat

    This incident was posted by mistake.

    holylogin01-04 were replaced by holylogin05-08 some time back.

    As always, the best method for obtaining a login node is usinglogin.rc.fas.harvard.edu which will pick a node for you.

    Or if you require a login node in a specific data center, use boslogin.rc.fas.harvard.edu (Boston) or holylogin.rc.fas.harvard.edu (Holyoke).

    See also: Command line access with Terminal (login nodes) – FASRC DOCS

  • În curs de investigare
    UTC
    În curs de investigare

    Holylogin chassis repair during maintenance was unsuccessful and replacement parts have been ordered.

    Audience:

    • All cluster users

    Impact:

    • All holylogin** servers will be down till further notice

    • Only Boston login nodes available (ie, boslogin[05-08])

    If you have holylogin hard-coded in your scripts, please update to login.rc.fas.harvard.edu or boslogin.rc.fas.harvard.edu for the time being, which will redirect you to an available login node.

    Updates to follow as we have them.

mar 2025

FASRC monthly maintenance - Monday March 3rd, 2025 from 9am-1pm
  • Actualizare
    martie 03, 2025 la 18:00UTC
    Actualizare
    martie 03, 2025 la 18:00UTC
    Maintenance has completed successfully
  • Finalizat
    martie 03, 2025 la 18:00UTC
    Finalizat
    martie 03, 2025 la 18:00UTC
    Maintenance has completed successfully
  • În curs
    martie 03, 2025 la 14:00UTC
    În curs
    martie 03, 2025 la 14:00UTC
    Maintenance is now in progress
  • Plănuit
    martie 03, 2025 la 14:00UTC
    Plănuit
    martie 03, 2025 la 14:00UTC

    PLEASE NOTE - New time window going forward - 9am-1pm

    FASRC monthly maintenance will take place Monday March 3rd, 2025 from 9am-1pm

    NOTICES

    • Training: Upcoming training from FASRC and other sources can be found on our Training Calendar. at https://www.rc.fas.harvard.edu/upcoming-training/

    • Status Page: You can subscribe to our status to receive notifications of maintenance, incidents, and their resolution at https://status.rc.fas.harvard.edu/ (click Get Updates for options).

    • Upcoming holidays: Memorial Day - Monday, May 26

    • You can subscribe to our status page using the Get Updates button in the upper right

    MAINTENANCE TASKS
    Cannon cluster will be paused during this maintenance?: YES
    FASSE cluster will be paused during this maintenance?: YES

    • Slurm Upgrade to 24.11.2 - Crucial Update

      • Audience: All cluster users

      • Impact: Jobs and the scheduler will be paused during this upgrade

    • Open Ondemand (OOD) reboots

      • Audience: All OOD users

      • Impact: All Open OnDemand (aka OOD/VDI/RCOOD) nodes will be rebooted

    • Login node reboots

      • Audience: Anyone logged into a FASRC Cannon or FASSE login node

      • Impact: Login nodes will rebooted during this maintenance window

    • bos-Isilon firmware updates

      • Audience: bos-isilon users

      • Impact: No noticeable impact for storage users

    • Netscratch retention/cleanup ( https://docs.rc.fas.harvard.edu/kb/policy-scratch/ )

      • Audience: Cluster users

      • Impact: Files older than 90 days will be removed. Please note that retention cleanup can and does run at any time, not just during the maintenance window.

    Thank you,
    FAS Research Computing
    https://www.rc.fas.harvard.edu/
    https://docs.rc.fas.harvard.edu/

mar 2025 către mai 2025

Următorul