FAS Research Computing - Observați istoricul

Toate sistemele operaționale

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Operațional

SLURM Scheduler - Cannon - Operațional

Cannon Compute Cluster (Holyoke) - Operațional

Boston Compute Nodes - Operațional

GPU nodes (Holyoke) - Operațional

seas_compute - Operațional

Operațional

SLURM Scheduler - FASSE - Operațional

FASSE Compute Cluster (Holyoke) - Operațional

Operațional

Kempner Cluster CPU - Operațional

Kempner Cluster GPU - Operațional

Operațional

FASSE login nodes - Operațional

Operațional

Cannon Open OnDemand - Operațional

FASSE Open OnDemand - Operațional

Operațional

Netscratch (Global Scratch) - Operațional

Home Directory Storage - Boston - Operațional

Tape - (Tier 3) - Operațional

Holylabs - Operațional

Isilon Storage Holyoke (Tier 1) - Operațional

Holystore01 (Tier 0) - Operațional

HolyLFS04 (Tier 0) - Operațional

HolyLFS05 (Tier 0) - Operațional

HolyLFS06 (Tier 0) - Operațional

Holyoke Tier 2 NFS - Operațional

Holyoke Specialty Storage - Operațional

holECS - Operațional

Isilon Storage Boston (Tier 1) - Operațional

BosLFS02 (Tier 0) - Operațional

Boston Tier 2 NFS - Operațional

CEPH Storage Boston (Tier 2) - Operațional

Boston Specialty Storage - Operațional

bosECS - Operațional

Samba Cluster - Operațional

Globus Data Transfer - Operațional

Observați istoricul

sep 2026

Cooling Distribution Unit (CDU) work 9/22 - 10/2 See details for affected partitions and dates
Programat pentru septembrie 22, 2026 la 11:00 – 11:00UTC
  • Plănuit
    septembrie 09, 2026 la 19:32UTC
    Plănuit
    septembrie 09, 2026 la 19:32UTC

    Over the past year we have noticed that water circulating through two of the Cooling Distribution Units (CDU) in Row 8a and their compute nodes has become significantly discoloured. This impurity causes cooling problems which as a result increases chances of node failure. To remedy FASRC has scheduled a full flush of these CDUs and their attached nodes. Unfortunately to do the full flush we have to fully power down all the nodes and drain the water, which is a process that takes several days to complete.

    To minimize disruption we have staggered this work over two weeks. The work on CDU5 will take place from 9/22 - 9/25, while CDU6 will take place from 9/29 - 10/2. Lists of impacted partitions are below. For those impacted we recommend using other resources on the cluster during that time such as shared and gpu_h200 or any of the requeue partitions. Note this work impacts both Cannon and FASSE.

    No jobs will be cancelled, rather blocking reservations are in place to naturally drain the nodes prior to the work.

    Thank you for your patience as we work to improve cluster stability and hardware longevity.

    CDU 5 (9/22 - 9/25)

    Cannon:

    arguelles_delgado_gpu_a100

    arguelles_delgado_gpu_mixed

    bigmem_intermediate

    blackhole_gpu

    eddy

    gershman

    hejazi

    hernquist_ice

    hoekstra

    huce_ice

    iaifi_gpu

    itc_gpu

    jshapiro

    kovac

    kozinsky

    kozinsky_gpu

    murphy_ic

    ortegahernandez_ice

    rivas

    seas_compute

    seas_gpu

    siag

    siag_gpu

    siag_combo

    sur

    zhuang

    FASSE:

    fasse_ultramem

    CDU 6 (9/29 - 10/2)

    Cannon:

    arguelles_delgado_h100

    bigmem

    dvorkin

    eddy

    enos

    gpu

    hsph

    hsph_gpu

    intermediate

    itc_cluster

    janson_sapphire

    joonholee

    jshapiro

    olveczky_sapphire

    sapphire

    test

    yao

    yao_alphatns

    yao_gpu

    FASSE:

    cnl

aug 2026

Rolling OS Upgrades August 24th - 27th 2026
  • Finalizat
    august 27, 2026 la 20:06UTC
    Finalizat
    august 27, 2026 la 20:06UTC

    OS upgrade work is mostly completed.

    There are a few remaining nodes in the cluster that did not successfully receive the upgrade.

    If you see nodes that are 'DOWN' for the following reasons, they are all nodes that need manual intervention for OS upgrade. FASRC staff are aware of them and will upgrade these nodes over the next week.

    • "wrong kernel"

    • "Not responding"

    • "unexpected reboot"

    • "gres/gpu count lower than configured"

    • "/n/sw not mounted"

    We appreciate your continued patience.

  • Actualizare
    august 26, 2026 la 20:01UTC
    Actualizare
    august 26, 2026 la 20:01UTC

    Today's work is complete. The final round, Cannon Part 3, takes place tomorrow.

    August 26th: Cannon Part 2
    arguelles_delgado
    conroy
    davies
    doshi-velez
    dsouza
    edwards
    geophysics
    giribet
    gpu_test
    hernquist
    huce_cascadeimasc
    janson
    kempner_h200
    kempner_rtx
    murphy
    ni_lab
    olveczky
    ortegahernandez
    pehlevan
    seas_compute
    shakhnovich
    shared
    unrestricted
    xlin
    yin
    zon

  • Actualizare
    august 25, 2026 la 19:37UTC
    Actualizare
    august 25, 2026 la 19:37UTC

    Today's work is complete for Cannon Part 1 and will resume tomorrow for Cannon Part 2

    August 25th: Cannon Part 1

    holylogin
    arguelles_delgado
    blackhole
    davies_gpu
    davies
    desai
    eddy
    holy-cow
    holy-smokes
    huce_bigmem
    huce_cascade
    huttenhower
    jacobsen2
    janson_bigmem
    janson_cascade
    janson
    ke
    lukin
    nguyen
    olveczky_gpu
    remoteviz
    seas_compute
    shared
    sompolinsky_gpu
    tambe
    vishwanath
    whipple
    xlin
    xlin_ice
    zhuang_gpu
    zhuang

  • Actualizare
    august 24, 2026 la 19:07UTC
    Actualizare
    august 24, 2026 la 19:07UTC

    Today's portion of the upgrades are completed. Tomorrow's list (Cannon part 1) can be found in this maintenance event.

    August 24th:

    FASSE
    boslogin
    private login nodes

  • În curs
    august 24, 2026 la 13:00UTC
    În curs
    august 24, 2026 la 13:00UTC
    Mentenanța este acum în curs
  • Plănuit
    august 03, 2026 la 19:35UTC
    Plănuit
    august 03, 2026 la 19:35UTC

    FASRC will be doing OS upgrades to the latest version of Rocky 8.10 from August 24-27th. These rolling upgrades will improve cluster security and install the latest Cuda 13.2 driver.

    Upgrades will happen in stages with each stage occurring between 8a-5p each day. During that period the nodes being upgraded will be unavailable. No jobs will be canceled but jobs will stay pending if all nodes in the partition are down.

    Note that during this week the cluster will be in a partially upgraded state, thus jobs that span multiple nodes may become unstable due to mismatching libraries. Users concerned about this should wait until August 28th to restart runs.

    Users should plan their work accordingly.

    The upgrade schedule with impacted partitions is as follows:

    August 24th:

    FASSE
    boslogin
    private login nodes

    August 25th: Cannon Part 1

    holylogin
    arguelles_delgado
    blackhole
    davies_gpu
    davies
    desai
    eddy
    holy-cow
    holy-smokes
    huce_bigmem
    huce_cascade
    huttenhower
    jacobsen2
    janson_bigmem
    janson_cascade
    janson
    ke
    lukin
    nguyen
    olveczky_gpu
    remoteviz
    seas_compute
    shared
    sompolinsky_gpu
    tambe
    vishwanath
    whipple
    xlin
    xlin_ice
    zhuang_gpu
    zhuang

    August 26th: Cannon Part 2
    arguelles_delgado
    conroy
    davies
    doshi-velez
    dsouza
    edwards
    geophysics
    giribet
    gpu_test
    hernquist
    huce_cascadeimasc
    janson
    kempner_h200
    kempner_rtx
    murphy
    ni_lab
    olveczky
    ortegahernandez
    pehlevan
    seas_compute
    shakhnovich
    shared
    unrestricted
    xlin
    yin
    zon

    August 27th: Cannon Part 3

    arguelles_delgado_gpu_a100
    arguelles_delgado_gpu_mixed
    arguelles_delgado_h100
    bigmem_intermediate
    bigmem
    blackhole_gpu
    dvorkin
    eddy
    enos
    gershman
    gpu
    gpu_h200
    hejazi
    hernquist_ice
    hoekstra
    hsph_gpu
    hsph
    huce_ice
    iaifi_gpu
    intermediate
    itc_cluster
    itc_gpu
    janson_sapphire
    joonholee
    jshapiro
    kempner_h100
    kempner_h200
    kempner
    kempner_interactive
    kovac
    kozinsky_gpu
    kozinsky
    murphy_ice
    mweber_compute
    mweber_gpu
    olveczky_sapphire
    ortegahernandez_ice
    rivas
    sapphire
    seas_compute
    seas_gpu
    seas_gpu_perf
    siag_gpu
    siag_combo
    siag
    sur
    test
    yao_alphatns
    yao_gpu
    yao
    zhuang

Emergency Slurm (scheduler) patch at 2pm ETA 1-2hours. Jobs will be paused
  • Actualizare
    UTC
    Actualizare

    A number of jobs appear to have terminated during the upgrade for some reason. Those jobs will re-queue or, if not, will need to be re-submitted,
    We apologize for the inconvenience.

  • Rezolvat
    UTC
    Rezolvat

    The update has been applied and the scheduler is returned to service. Jobs are unpaused.

  • În curs de investigare
    UTC
    În curs de investigare

    We have been manually dealing with a Slurm memory leak bug behind the scenes and now have an official fix in the form of a Slurm upgrade (26.05.3). It is necessary to get this update in place as soon as possible.

    At 2pm today we will pause the cluster. Jobs will be paused, not terminated, and the scheduler will be unavailable for querying or submitting new jobs until the update is completed. Once complete, jobs will resume.

    Technical information about the bug:

    https://support.schedmd.com/show_bug.cgi?id=25685

iul 2026

FASRC monthly maintenance Monday July 6th, 2026 9am-1pm
  • Finalizat
    iulie 06, 2026 la 17:00UTC
    Finalizat
    iulie 06, 2026 la 17:00UTC
    Mentenanța a fost finalizată cu succes
  • În curs
    iulie 06, 2026 la 13:00UTC
    În curs
    iulie 06, 2026 la 13:00UTC
    Mentenanța este acum în curs
  • Plănuit
    iunie 26, 2026 la 13:45UTC
    Plănuit
    iunie 26, 2026 la 13:45UTC

    FASRC monthly maintenance will take place on July 6th 2026. Our maintenance tasks should be completed between 9am-1pm.

    Cannon cluster will be paused during this maintenance?: NO
    FASSE cluster will be paused during this maintenance?: NO

    NOTICES:

    • Friday July 3rd is a university holiday (independence Day observed)

    • Training: Upcoming training from FASRC and other sources can be found on our Training Calendar. at https://www.rc.fas.harvard.edu/upcoming-training/

    • Status Page: You can subscribe to our status to receive notifications of maintenance, incidents, and their resolution at https://status.rc.fas.harvard.edu/ (click Get Updates for options).

    • We'd love to hear success stories about your or your lab's use of FASRC. Submit your story here.

    MAINTENANCE TASKS

    • Domain controller replacement

      • Audience: Internal

      • Impact: None. End users should not see any impact.

    • Reboot drained nodes in error state

      • Audience: Cluster nodes with errors.

      • Impact: These nodes will have been drained already in preparation. No impact on jobs on the day and the affected nodes will return to service in their respective partitions after the maintenance period.

    • OOD/Open OnDemand reboots

      • Audience: All OOD users, reboot of the head nodes.

      • Impact: Running sessions will not be affected.

    • Login node reboots

      • Audience; All login node users.

      • Impact: Login nodes will reboot during the maintenance window.

    • Netscratch 90-day retention cleanup

      • Audience; All netscratch users

      • Impact: Files older than 90 days will be removed per our scratch policy. Please note that this cleanup can happen at any time, not just during maintenance.

    Thank you,