FAS Research Computing - FASRC monthly maintenance will take place on September 14th, 2026. – Detalhes de manutenções

Todos os sistemas operacionais

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

FASRC monthly maintenance will take place on September 14th, 2026.

Ainda não começou
Programado para setembro 14, 2026 em 13:00 – 17:00UTC

Afeta

Cannon Cluster

Em Manutenção de 1:00 PM para 12:00 AM

SLURM Scheduler - Cannon

Em Manutenção de 1:00 PM para 12:00 AM

Cannon Compute Cluster (Holyoke)

Em Manutenção de 1:00 PM para 12:00 AM

Boston Compute Nodes

Em Manutenção de 1:00 PM para 12:00 AM

GPU nodes (Holyoke)

Em Manutenção de 1:00 PM para 12:00 AM

seas_compute

Em Manutenção de 1:00 PM para 12:00 AM

Atualizações
  • Ainda não começou
    agosto 31, 2026 em 18:56UTC
    Ainda não começou
    agosto 31, 2026 em 18:56UTC

    Our maintenance tasks should be completed between 9am-1pm.
    Some power work on row 7c will run 9-5 but will not affect running jobs or new jobs (see below).

    NOTICES:

    MAINTENANCE TASKS

    Cannon cluster will be paused during this maintenance?: YES
    FASSE cluster will be paused during this maintenance?: YES

    • Slurm Upgrade to 26.05.4

      • Audience: Cluster

      • Impact: The cluster will be paused during this maintenance

    • New: Enable Termination of User Processes on Logout

      • Audience: Cluster

      • Impact: Going forward all user processes will be terminated upon login session exit on the login nodes, excluding things running in screen and tmux. Users should leverage the cluster for non-interactive processes. This is to clean up after AI agents which tend to create orphaned processes which drag down login node performance.

    • New: watch command cadence limit

      • Audience: Cluster

      • Impact:The watch command will have a minimum cadence of 60s when used on commands talking to the slurm scheduler (i.e. squeue, showq, sinfo, scontrol, sdiag, lsload). Users desiring faster polling should leverage the sacct command that talks to the slurm database. In general users should not poll the scheduler more than once every minute, ideally once every 5-10 minutes. Polling more often slows the scheduler. FASRC reserves the right to ban users who who tax the scheduler with queries. For more on cluster customs and responsibilities see: https://docs.rc.fas.harvard.edu/kb/responsibilities/

    • Holyoke/MGHPCC row 7c power work - 9am-5pm

      • Audience: Cluster

      • Impact: MGHPCC will be upgrading power on Pod 7c Even Side on September 14th 7am-5pm. This necessitates idling half the nodes on that side of the pod. A blocking reservation has been put in place to accomplish this. No jobs will be canceled but users will notice degraded scheduling throughput due to half the nodes being closed in the following partitions: 

        arguelles_delgado, blackhole, conroy, davies, desai, doshi-velez, dsouza, eddy, edwards, geophysics, giribet, gpu_test, hernquist, huce_cascade, huttenhower, imasc, jacobsen2, janson_cascade, janson, ke, lukin, murphy, nguyen, ni_lab, olveczky, ortegahernandez, pehlevan, seas_compute, shared, shakhnovich, tambe, unrestricted, vishwanath, whipple, xlin, yin, zon

    • Login node reboots 

      • Audience: All login nodes

      • Impact: Login nodes will be unavailable until after maintenance

    • OOD/Open OnDemand down/reboots

      • Audience: All OOD users

      • Impact: OOD will be unavailable until after maintenance

    • Gurobi license key update

      • Audience: Anyone who uses Gurobi software on the clusters.

      • Impact: Jobs running Gurobi may fail. FASRC recommends waiting until maintenance is over to run Gurobi jobs.

    • Netscratch 90-day retention cleanup

      • Audience; All netscratch users

      • Impact: Files older than 90 days will be removed per our scratch policy. Please note that this cleanup can happen at any time, not just during maintenance.

    Thank you,
    FAS Research Computing
    https://docs.rc.fas.harvard.edu/
    https://www.rc.fas.harvard.edu/