FAS Research Computing - Ilmoitushistoria

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Toiminnassa

SLURM Scheduler - Cannon - Toiminnassa

Cannon Compute Cluster (Holyoke) - Toiminnassa

Boston Compute Nodes - Toiminnassa

GPU nodes (Holyoke) - Toiminnassa

seas_compute - Toiminnassa

Toiminnassa

SLURM Scheduler - FASSE - Toiminnassa

FASSE Compute Cluster (Holyoke) - Toiminnassa

Toiminnassa

Kempner Cluster CPU - Toiminnassa

Kempner Cluster GPU - Toiminnassa

Toiminnassa

FASSE login nodes - Toiminnassa

Toiminnassa

Cannon Open OnDemand - Toiminnassa

FASSE Open OnDemand - Toiminnassa

Suuri katkos

Netscratch (Global Scratch) - Toiminnassa

Home Directory Storage - Boston - Toiminnassa

Tape - (Tier 3) - Toiminnassa

Holylabs - Toiminnassa

Isilon Storage Holyoke (Tier 1) - Toiminnassa

Holystore01 (Tier 0) - Toiminnassa

HolyLFS04 (Tier 0) - Toiminnassa

HolyLFS05 (Tier 0) - Toiminnassa

HolyLFS06 (Tier 0) - Suuri katkos

Holyoke Tier 2 NFS - Toiminnassa

Holyoke Specialty Storage - Toiminnassa

holECS - Toiminnassa

Isilon Storage Boston (Tier 1) - Toiminnassa

BosLFS02 (Tier 0) - Toiminnassa

Boston Tier 2 NFS - Toiminnassa

CEPH Storage Boston (Tier 2) - Toiminnassa

Boston Specialty Storage - Toiminnassa

bosECS - Toiminnassa

Samba Cluster - Toiminnassa

Globus Data Transfer - Toiminnassa

Ilmoitushistoria

Näytä nykyinen tila

marras 2026

holylfs06 degraded
SeurataanSuuri katkos
  • PäivitysUTC

    Dell has completed the hardware replacement, and the affected storage drives are now visible to the system.

    We are currently running filesystem integrity checks before proceeding with recovery.

    We’ll provide another update once these checks are complete and we have a clearer picture of when service can be restored.

  • PäivitysUTC

    Work to replace the failed Dell ME5084 enclosure has begun. Dell technicians and FASRC engineers are on-site and proceeding with the hardware replacement.

    We will provide another update once the replacement is complete and we have assessed the status of the system.

  • SeurataanUTC

    The replacement chassis is on its way and Dell technicians have been scheduled for Thursday morning. FASRC staff will be onsite to supervise the replacement process, assist the technicians as needed, and help verify that everything is functioning properly afterward.

    Once the replacement is complete, FASRC will confirm that all drives and virtual disks are properly recognized and that the affected Lustre OSTs can be brought back online.

    Updates will be provided on Thursday following the chassis swap, including the results of the replacement and the status of the holylfs06 filesystem.

    We appreciate your continued patience.

  • PäivitysUTC

    As of now we have a preliminary ship date of Wednesday Nov 18th for the replacement chassis.
    The chassis will then need to be swapped. No ETA until we have the new chassis on-hand at the datacenter.

  • PäivitysUTC

    During a routine drive replacement on the Dell ME5084 (the holylfs06 system), an unexpected hardware failure caused an entire row of drives to lose connectivity.

    The issue has been identified as a hardware failure requiring replacement of the entire enclosure.

    We are coordinating with Dell on the replacement process and expect to have more information tomorrow, including the estimated arrival time for the replacement hardware and the procedure for completing the swap.

    We will provide another update once those details are confirmed.

    Thank you for your patience and cooperation.

  • PäivitysUTC

    holylfs06 repairs require a full unmounting of the filesystem. It will not be available during this time.

    We are continuing to work on a fix for this incident.

  • TunnistettuUTC

    holylfs06 is in a very degraded or stuck state.

    Expect degraded to no access until the system is back up.

loka 2026

LOKA24
Globus scheduled maintenance
ValmistunutHuoltotunti
  • Valmistunutlokakuuta 24, 2026 klo 15.30UTC
    Huolto on suoritettu onnistuneesti
  • Meneilläänlokakuuta 24, 2026 klo 14.30UTC
    Huolto on nyt käynnissä
  • Suunniteltulokakuuta 19, 2026 klo 15.30UTC

    Globus services will be unavailable for a period between 9:30am and 10:30am U.S. Central time on Saturday, October 24, 2026 due to planned maintenance (https://www.globus.org/blog/2026-10-24-maintenance) that includes database upgrades.

    Please refer to the posted link for additional information on how services and in-progress work will be impacted during this window.