FAS Research Computing - Hinweisverlauf

Alle Systeme betriebsbereit

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Betriebsbereit

SLURM Scheduler - Cannon - Betriebsbereit

Cannon Compute Cluster (Holyoke) - Betriebsbereit

Boston Compute Nodes - Betriebsbereit

GPU nodes (Holyoke) - Betriebsbereit

seas_compute - Betriebsbereit

Betriebsbereit

SLURM Scheduler - FASSE - Betriebsbereit

FASSE Compute Cluster (Holyoke) - Betriebsbereit

Betriebsbereit

Kempner Cluster CPU - Betriebsbereit

Kempner Cluster GPU - Betriebsbereit

Betriebsbereit

FASSE login nodes - Betriebsbereit

Betriebsbereit

Cannon Open OnDemand - Betriebsbereit

FASSE Open OnDemand - Betriebsbereit

Betriebsbereit

Netscratch (Global Scratch) - Betriebsbereit

Home Directory Storage - Boston - Betriebsbereit

Tape - (Tier 3) - Betriebsbereit

Holylabs - Betriebsbereit

Isilon Storage Holyoke (Tier 1) - Betriebsbereit

Holystore01 (Tier 0) - Betriebsbereit

HolyLFS04 (Tier 0) - Betriebsbereit

HolyLFS05 (Tier 0) - Betriebsbereit

HolyLFS06 (Tier 0) - Betriebsbereit

Holyoke Tier 2 NFS - Betriebsbereit

Holyoke Specialty Storage - Betriebsbereit

holECS - Betriebsbereit

Isilon Storage Boston (Tier 1) - Betriebsbereit

BosLFS02 (Tier 0) - Betriebsbereit

Boston Tier 2 NFS - Betriebsbereit

CEPH Storage Boston (Tier 2) - Betriebsbereit

Boston Specialty Storage - Betriebsbereit

bosECS - Betriebsbereit

Samba Cluster - Betriebsbereit

Globus Data Transfer - Betriebsbereit

Nov. 2026

holylfs06 degraded
GelöstSchwerer Ausfall77 Stunden 56 Minuten
  • GelöstUTC

    holylfs06 is back up and mounted across the cluster.

    No data disks were corrupted. However users should check their data for integrity, particularly files that were open and writing when the system went down.

    This incident has been resolved. Thank you again for your cooperation.

  • UpdateUTC

    Dell has completed the hardware replacement, and the affected storage drives are now visible to the system.

    We are currently running filesystem integrity checks before proceeding with recovery.

    We’ll provide another update once these checks are complete and we have a clearer picture of when service can be restored.

  • UpdateUTC

    Work to replace the failed Dell ME5084 enclosure has begun. Dell technicians and FASRC engineers are on-site and proceeding with the hardware replacement.

    We will provide another update once the replacement is complete and we have assessed the status of the system.

  • ÜberwachungUTC

    The replacement chassis is on its way and Dell technicians have been scheduled for Thursday morning. FASRC staff will be onsite to supervise the replacement process, assist the technicians as needed, and help verify that everything is functioning properly afterward.

    Once the replacement is complete, FASRC will confirm that all drives and virtual disks are properly recognized and that the affected Lustre OSTs can be brought back online.

    Updates will be provided on Thursday following the chassis swap, including the results of the replacement and the status of the holylfs06 filesystem.

    We appreciate your continued patience.

  • UpdateUTC

    As of now we have a preliminary ship date of Wednesday Nov 18th for the replacement chassis.
    The chassis will then need to be swapped. No ETA until we have the new chassis on-hand at the datacenter.

  • UpdateUTC

    During a routine drive replacement on the Dell ME5084 (the holylfs06 system), an unexpected hardware failure caused an entire row of drives to lose connectivity.

    The issue has been identified as a hardware failure requiring replacement of the entire enclosure.

    We are coordinating with Dell on the replacement process and expect to have more information tomorrow, including the estimated arrival time for the replacement hardware and the procedure for completing the swap.

    We will provide another update once those details are confirmed.

    Thank you for your patience and cooperation.

  • UpdateUTC

    holylfs06 repairs require a full unmounting of the filesystem. It will not be available during this time.

    We are continuing to work on a fix for this incident.

  • IdentifizierungUTC

    holylfs06 is in a very degraded or stuck state.

    Expect degraded to no access until the system is back up.

Okt. 2026

OKT24
Globus scheduled maintenance
AbgeschlossenWartung1 Stunde
  • AbgeschlossenOktober 24, 2026 um 15:30UTC
    Die Wartung wurde erfolgreich abgeschlossen
  • In BearbeitungOktober 24, 2026 um 14:30UTC
    Die Wartung ist jetzt im Gange
  • GeplantOktober 19, 2026 um 15:30UTC

    Globus services will be unavailable for a period between 9:30am and 10:30am U.S. Central time on Saturday, October 24, 2026 due to planned maintenance (https://www.globus.org/blog/2026-10-24-maintenance) that includes database upgrades.

    Please refer to the posted link for additional information on how services and in-progress work will be impacted during this window.