FAS Research Computing - Bemærk historie

Alle systemer er operationelle

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Operationel

SLURM Scheduler - Cannon - Operationel

Cannon Compute Cluster (Holyoke) - Operationel

Boston Compute Nodes - Operationel

GPU nodes (Holyoke) - Operationel

seas_compute - Operationel

Operationel

SLURM Scheduler - FASSE - Operationel

FASSE Compute Cluster (Holyoke) - Operationel

Operationel

Kempner Cluster CPU - Operationel

Kempner Cluster GPU - Operationel

Operationel

FASSE login nodes - Operationel

Operationel

Cannon Open OnDemand - Operationel

FASSE Open OnDemand - Operationel

Operationel

Netscratch (Global Scratch) - Operationel

Home Directory Storage - Boston - Operationel

Tape - (Tier 3) - Operationel

Holylabs - Operationel

Isilon Storage Holyoke (Tier 1) - Operationel

Holystore01 (Tier 0) - Operationel

HolyLFS04 (Tier 0) - Operationel

HolyLFS05 (Tier 0) - Operationel

HolyLFS06 (Tier 0) - Operationel

Holyoke Tier 2 NFS (new) - Operationel

Holyoke Specialty Storage - Operationel

holECS - Operationel

Isilon Storage Boston (Tier 1) - Operationel

BosLFS02 (Tier 0) - Operationel

Boston Tier 2 NFS (new) - Operationel

CEPH Storage Boston (Tier 2) - Operationel

Boston Specialty Storage - Operationel

bosECS - Operationel

Samba Cluster - Operationel

Globus Data Transfer - Operationel

Bemærk historie

maj 2025

MGHPCC power work 5/21 - 5/23 - Some partitions will be at half capacity
  • Gennemført
    maj 23, 2025 ved 19:00UTC
    Gennemført
    maj 23, 2025 ved 19:00UTC
    Maintenance has completed successfully
  • Igangværende
    maj 21, 2025 ved 11:00UTC
    Igangværende
    maj 21, 2025 ved 11:00UTC
    Maintenance is now in progress
  • Planlagt
    maj 21, 2025 ved 11:00UTC
    Planlagt
    maj 21, 2025 ved 11:00UTC

    The MGHPCC Holyoke data center will be performing power work on May 21st -23rd. This work will take out one half (or one 'side') of the power capacity for certain rows/racks including our compute rows. Because of our power draw, one side is not enough power to keep each full rack running.

    As such, we will be adding a reservation to idle half the nodes in the partitions listed below. A reservation will cause nodes to drain as jobs complete and stop scheduling new jobs on those nodes if they cannot be completed before the outage. This will allow us to idle and power down those nodes prior to the work and avoid potential blackout/brownout on those racks.

    This will mean that these partitions will be up and available, but that half the nodes from each will be down (assuming an even number of nodes).

    This work is part of an on-going power capacity upgrade at MGHPCC. We expect this will be the last power work needed and the facility will then provide enough additional power for future expansion as well adding overhead for the current load.

    The affected partitions are:

    • arguelles_delgado

    • bigmem_intermediate

    • blackhole_gpu

    • eddy gershman

    • hejazi

    • hernquist

    • hoekstra

    • huce_ice

    • iaifi_gpu

    • iaifi_gpu_requeue

    • iaifi_priority

    • jshapiro

    • jshapiro_priority

    • kempner

    • kempner_requeue

    • kempner_h100

    • kempner_h100_priority

    • kempner_h100_priority2

    • kovac kozinsky

    • kozinsky_gpu

    • kozinsky_requeue

    • ortegahernandez_ice

    • rivas

    • seas_compute

    • seas_gpu

    • siag_combo

    • siag_gpu

    • sur

    • zhuang

apr. 2025

Login nodes temporarily down
  • Løst
    UTC
    Løst

    Cannon boslogin and FASSE login nodes are back up and operational.

    All holylogin nodes are still down for repair, please see our posted incident for more updates: https://status.rc.fas.harvard.edu/cm97gyay90013dturk7fxg5pb

    We apologize for the unexpected disruption.

  • Undersøger
    UTC
    Undersøger

    Due to a configuration error, all cluster login nodes are rebooting and are temporarily unavailable. Please save any work immediately.

holylogin[05-08] down
  • Løst
    UTC
    Løst
    Hardware has been repaired and holyoke login nodes are back online. Thanks for your patience.
  • Overvåger
    UTC
    Overvåger

    Holylogin chassis repair during maintenance was unsuccessful and replacement parts have been ordered.

    • holyoke login nodes (holylogin05-08) are down for hardware repair

    • Only Boston login nodes available (ie, boslogin[05-08])

    If you have holylogin hard-coded in your scripts, please update to login.rc.fas.harvard.edu or boslogin.rc.fas.harvard.edu for the time being, which will redirect you to an available login node.

    As always, the best method for obtaining a login node is usinglogin.rc.fas.harvard.edu which will pick a node for you.

    If you require a login node in a specific data center, use boslogin.rc.fas.harvard.edu (Boston) or (once they are back in service) holylogin.rc.fas.harvard.edu (Holyoke).

    See also: Command line access with Terminal (login nodes) – FASRC DOCS

  • Løst
    UTC
    Løst

    This incident was posted by mistake.

    holylogin01-04 were replaced by holylogin05-08 some time back.

    As always, the best method for obtaining a login node is usinglogin.rc.fas.harvard.edu which will pick a node for you.

    Or if you require a login node in a specific data center, use boslogin.rc.fas.harvard.edu (Boston) or holylogin.rc.fas.harvard.edu (Holyoke).

    See also: Command line access with Terminal (login nodes) – FASRC DOCS

  • Undersøger
    UTC
    Undersøger

    Holylogin chassis repair during maintenance was unsuccessful and replacement parts have been ordered.

    Audience:

    • All cluster users

    Impact:

    • All holylogin** servers will be down till further notice

    • Only Boston login nodes available (ie, boslogin[05-08])

    If you have holylogin hard-coded in your scripts, please update to login.rc.fas.harvard.edu or boslogin.rc.fas.harvard.edu for the time being, which will redirect you to an available login node.

    Updates to follow as we have them.

mar. 2025

FASRC monthly maintenance - Monday March 3rd, 2025 from 9am-1pm
  • Opdatering
    marts 03, 2025 ved 18:00UTC
    Opdatering
    marts 03, 2025 ved 18:00UTC
    Maintenance has completed successfully
  • Gennemført
    marts 03, 2025 ved 18:00UTC
    Gennemført
    marts 03, 2025 ved 18:00UTC
    Maintenance has completed successfully
  • Igangværende
    marts 03, 2025 ved 14:00UTC
    Igangværende
    marts 03, 2025 ved 14:00UTC
    Maintenance is now in progress
  • Planlagt
    marts 03, 2025 ved 14:00UTC
    Planlagt
    marts 03, 2025 ved 14:00UTC

    PLEASE NOTE - New time window going forward - 9am-1pm

    FASRC monthly maintenance will take place Monday March 3rd, 2025 from 9am-1pm

    NOTICES

    • Training: Upcoming training from FASRC and other sources can be found on our Training Calendar. at https://www.rc.fas.harvard.edu/upcoming-training/

    • Status Page: You can subscribe to our status to receive notifications of maintenance, incidents, and their resolution at https://status.rc.fas.harvard.edu/ (click Get Updates for options).

    • Upcoming holidays: Memorial Day - Monday, May 26

    • You can subscribe to our status page using the Get Updates button in the upper right

    MAINTENANCE TASKS
    Cannon cluster will be paused during this maintenance?: YES
    FASSE cluster will be paused during this maintenance?: YES

    • Slurm Upgrade to 24.11.2 - Crucial Update

      • Audience: All cluster users

      • Impact: Jobs and the scheduler will be paused during this upgrade

    • Open Ondemand (OOD) reboots

      • Audience: All OOD users

      • Impact: All Open OnDemand (aka OOD/VDI/RCOOD) nodes will be rebooted

    • Login node reboots

      • Audience: Anyone logged into a FASRC Cannon or FASSE login node

      • Impact: Login nodes will rebooted during this maintenance window

    • bos-Isilon firmware updates

      • Audience: bos-isilon users

      • Impact: No noticeable impact for storage users

    • Netscratch retention/cleanup ( https://docs.rc.fas.harvard.edu/kb/policy-scratch/ )

      • Audience: Cluster users

      • Impact: Files older than 90 days will be removed. Please note that retention cleanup can and does run at any time, not just during the maintenance window.

    Thank you,
    FAS Research Computing