FAS Research Computing - A cooling incident at the MGHPCC Datacenter has effected a number of systems – 故障详情

目前部分性能下降

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

A cooling incident at the MGHPCC Datacenter has effected a number of systems

已解决
严重故障
开始于 大约 4 年前持续 大约 3 小时

受到影响

Cannon Cluster

严重故障 从 7:13 PM 至 10:33 PM

SLURM Scheduler - Cannon

严重故障 从 7:13 PM 至 10:33 PM

Cannon Compute Cluster (Holyoke)

严重故障 从 7:13 PM 至 10:33 PM

Login Nodes

严重故障 从 7:13 PM 至 10:33 PM

login.rc.fas.harvard.edu

严重故障 从 7:13 PM 至 10:33 PM

Login Nodes - Holyoke

严重故障 从 7:13 PM 至 10:33 PM

更新
  • 已解决
    已解决

    All cooling, including the water cooling for water-cooled compute nodes, is back online. All partitions are open for jobs. Some compute nodes in various partitions may still require individual attention, so not every compute node is back online, but we will work to bring them all online in the coming hours.

  • 持续监控中
    持续监控中

    Most storage in Holyoke is back up.

    The Slurm scheduler is back up and accepting jobs. However, most public partitions are down as the water cooling systems for those compute racks require in-person attention. RC staff are already en route to the datacenter to address this.

    The Academic Cluster is back up.

  • 调查中
    调查中

    A cooling failure caused temperatures in the MGHPCC datacenter to exceed the safe range of operation for many systems, causing them to power down to prevent permanent damage.

    The cooling issue has been resolved and we are beginning to power systems back on. Expect outage on various systems until the issue is resolved.

  • 持续监控中
    持续监控中

    A cooling failure caused temperatures in the MGHPCC datacenter to exceed the safe range of operation for many systems, causing them to power down to prevent permanent damage.