FAS Research Computing - Istorija obaveštenja

Svi sistemi funkcionišu

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Funkcioniše

SLURM Scheduler - Cannon - Funkcioniše

Cannon Compute Cluster (Holyoke) - Funkcioniše

Boston Compute Nodes - Funkcioniše

GPU nodes (Holyoke) - Funkcioniše

seas_compute - Funkcioniše

Funkcioniše

SLURM Scheduler - FASSE - Funkcioniše

FASSE Compute Cluster (Holyoke) - Funkcioniše

Funkcioniše

Kempner Cluster CPU - Funkcioniše

Kempner Cluster GPU - Funkcioniše

Funkcioniše

FASSE login nodes - Funkcioniše

Funkcioniše

Cannon Open OnDemand - Funkcioniše

FASSE Open OnDemand - Funkcioniše

Funkcioniše

Netscratch (Global Scratch) - Funkcioniše

Home Directory Storage - Boston - Funkcioniše

Tape - (Tier 3) - Funkcioniše

Holylabs - Funkcioniše

Isilon Storage Holyoke (Tier 1) - Funkcioniše

Holystore01 (Tier 0) - Funkcioniše

HolyLFS04 (Tier 0) - Funkcioniše

HolyLFS05 (Tier 0) - Funkcioniše

HolyLFS06 (Tier 0) - Funkcioniše

Holyoke Tier 2 NFS (new) - Funkcioniše

Holyoke Specialty Storage - Funkcioniše

holECS - Funkcioniše

Isilon Storage Boston (Tier 1) - Funkcioniše

BosLFS02 (Tier 0) - Funkcioniše

Boston Tier 2 NFS (new) - Funkcioniše

CEPH Storage Boston (Tier 2) - Funkcioniše

Boston Specialty Storage - Funkcioniše

bosECS - Funkcioniše

Samba Cluster - Funkcioniše

Globus Data Transfer - Funkcioniše

Istorija obaveštenja

Apr 2022

A cooling incident at the MGHPCC Datacenter has effected a number of systems
  • Rešeno
    UTC
    Rešeno

    All cooling, including the water cooling for water-cooled compute nodes, is back online. All partitions are open for jobs. Some compute nodes in various partitions may still require individual attention, so not every compute node is back online, but we will work to bring them all online in the coming hours.

  • Nadgledanje
    UTC
    Nadgledanje

    Most storage in Holyoke is back up.

    The Slurm scheduler is back up and accepting jobs. However, most public partitions are down as the water cooling systems for those compute racks require in-person attention. RC staff are already en route to the datacenter to address this.

    The Academic Cluster is back up.

  • Istražuje se
    UTC
    Istražuje se

    A cooling failure caused temperatures in the MGHPCC datacenter to exceed the safe range of operation for many systems, causing them to power down to prevent permanent damage.

    The cooling issue has been resolved and we are beginning to power systems back on. Expect outage on various systems until the issue is resolved.

  • Nadgledanje
    UTC
    Nadgledanje

    A cooling failure caused temperatures in the MGHPCC datacenter to exceed the safe range of operation for many systems, causing them to power down to prevent permanent damage.

    The cooling issue has been resolved and we are beginning to power systems back on. Expect outage on various systems until the issue is resolved.

Mar 2022

Feb 2022

Feb 2022 do Apr 2022

Sledeći