SLURM Scheduler - Cannon - Работает
SLURM Scheduler - Cannon
Cannon Compute Cluster (Holyoke) - Работает
Cannon Compute Cluster (Holyoke)
Boston Compute Nodes - Работает
Boston Compute Nodes
GPU nodes (Holyoke) - Работает
GPU nodes (Holyoke)
seas_compute - Работает
seas_compute
SLURM Scheduler - FASSE - Работает
SLURM Scheduler - FASSE
FASSE Compute Cluster (Holyoke) - Работает
FASSE Compute Cluster (Holyoke)
Kempner Cluster CPU - Работает
Kempner Cluster CPU
Kempner Cluster GPU - Работает
Kempner Cluster GPU
FASSE login nodes - Работает
FASSE login nodes
Cannon Open OnDemand - Работает
Cannon Open OnDemand
FASSE Open OnDemand - Работает
FASSE Open OnDemand
Netscratch (Global Scratch) - Работает
Netscratch (Global Scratch)
Home Directory Storage - Boston - Работает
Home Directory Storage - Boston
Tape - (Tier 3) - Работает
Tape - (Tier 3)
Holylabs - Работает
Holylabs
Isilon Storage Holyoke (Tier 1) - Работает
Isilon Storage Holyoke (Tier 1)
Holystore01 (Tier 0) - Работает
Holystore01 (Tier 0)
HolyLFS04 (Tier 0) - Работает
HolyLFS04 (Tier 0)
HolyLFS05 (Tier 0) - Работает
HolyLFS05 (Tier 0)
HolyLFS06 (Tier 0) - Работает
HolyLFS06 (Tier 0)
Holyoke Tier 2 NFS - Работает
Holyoke Tier 2 NFS
Holyoke Specialty Storage - Работает
Holyoke Specialty Storage
holECS - Работает
holECS
Isilon Storage Boston (Tier 1) - Работает
Isilon Storage Boston (Tier 1)
BosLFS02 (Tier 0) - Работает
BosLFS02 (Tier 0)
Boston Tier 2 NFS - Работает
Boston Tier 2 NFS
CEPH Storage Boston (Tier 2) - Работает
CEPH Storage Boston (Tier 2)
Boston Specialty Storage - Работает
Boston Specialty Storage
bosECS - Работает
bosECS
Samba Cluster - Работает
Samba Cluster
Globus Data Transfer - Работает
Globus Data Transfer
История уведомлений
Посмотреть текущий статусокт. 2022
сент. 2022
- Завершено · сентября 21, 2022 в 21:00UTC
Maintenance has completed successfully
- В ходе выполнения · сентября 21, 2022 в 13:00UTC
Maintenance is now in progress
- Запланировано · сентября 21, 2022 в 13:00UTC
Our service partner New England Research Cloud (NERC) has a planned maintenance event on Wednesday 9/21/22 from 9am to 5pm.
If you are a NERC user, please see: https://nerc.instatus.com/cl6qt8sbr2993aemv5algl4ih Updates will be shown on their status page.
You can also subscribe to their status page by following that link and clicking Get Updates and choosing your notification method.
- Решено · UTC
This issue has become one of supply and availability. As such, we are changing this issue to Maintenance as there is nothing further we can do until the vendor replaces the hardware. Please continue to use other GPU resources. We will notify the community once we have new hardware to replenish the gpu_test queue.
Please see Running Jobs for other available resources.
- Обновление · UTC
Difficulty obtaining replacement mainboards has this issue stalled. More information when we have it.
- Обновление · UTC
Correction to first part of previous update:
Currently only 2 of the nodes in gpu_test are working and the single remoteviz node is down. These will require help from the vendor to revive. We are also investigating with them the root cause for multiple node failures. No ETA
- Обновление · UTC
Currently only 2 of the nodes in gpu_test are working and the single remoteviz node is down. These will require help from the vendor to revive. We are also investigating with them the root cause for multiple node failures. No ETA
As a result of this, we are pre-emptively modifying the QoS for gpu_test now. We had planned to make a change on Thursday after announcing it in tomorrow's maintenance email, but this forces our hand.
QoS changes for gpu_test effective now: Limited to 1 job per user. That job is limited to a maximum 16 cores and 90GB memory.
See Running Jobs for a list of available partitions, including the gpu partition.
- Определено · UTC
Please note that this issue also affects the remoteviz partition.
Updates as we have them.
- Изучается · UTC
Several hosts in the gpu_test queue have become unresponsive and will require a physical visit to reset. Staff are en route to the data center.
On a related note, please do not use gputest as a workaround for the regular gpuqueues.
This is unfair to other users and ties up the gpu_test partition. This partition is not for general job use.We will be addressing this issue later this week by reducing the number of jobs allowed per user. This will be noted in tomorrow's maintenance email and then implemented Thursday.
авг. 2022
- Завершено · августа 26, 2022 в 20:43UTC
Maintenance has completed successfully.
- В ходе выполнения · августа 22, 2022 в 10:00UTC
Maintenance is now in progress
- Запланировано · августа 22, 2022 в 10:00UTC
Our tier 3 tape system is part of and run by NESE (the NorthEast Storage Exchange).
We have been informed that they will be performing a significant upgrade of their Spectrum Scale archive system starting August 15th. This is a multi-day upgrade and will take approximately 3 days (potential for longer). Tier 3 tape allocations will be unavailable during this upgrade.
NESE has informed us that this maintenance will be deferred to next week (9/22/22).

