FAS Research Computing - Shutdown nodes in 8A14, 8A16 and 8A18 - Cooling Leak – Detaliile incidentului

Performanță parțial degradată

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Shutdown nodes in 8A14, 8A16 and 8A18 - Cooling Leak

Rezolvat
Întrerupere parțială 30 %
Început la 10 luni în urmăA durat 4 zile

Afectat

Cannon Cluster

Întrerupere parțială din 9:45 PM către 4:06 PM

SLURM Scheduler - Cannon

Întrerupere parțială din 9:45 PM către 4:06 PM

Cannon Compute Cluster (Holyoke)

Întrerupere parțială din 9:45 PM către 4:06 PM

Boston Compute Nodes

Întrerupere parțială din 9:45 PM către 4:06 PM

GPU nodes (Holyoke)

Întrerupere parțială din 9:45 PM către 4:06 PM

seas_compute

Întrerupere parțială din 9:45 PM către 4:06 PM

Actualizări
  • Rezolvat
    Rezolvat

    Thanks to staff that made multiple datacenter visits, the leak has been addressed and all systems are back up and running.

    This incident has been resolved.

  • În curs de monitorizare
    În curs de monitorizare

    8a14 and 8a18 are back online, 8a16 is still down

    That includes mweber_gpu and mweber_compute being back up and seas_gpu still partially down

  • Actualizare
    Actualizare

    Power and water is shutdown to these racks and the vendor is working to send someone in next working day to investigate. Partition totally down are mweber_compute, mweber_gpu, seas_gpu and seas_compute.

  • Identificat
    Identificat

    Row 8A18 (row 8A rack18) will also be shut down.

  • În curs de investigare
    În curs de investigare

    MGHPCC found a leak in 8A14 or 8A16 racks and asked us to shutdown those nodes. We are working with the vendor to fix the issue ASAP.