FAS Research Computing - 공지 내역

HolyLFS06 (Tier 0)에서 심각한 장애가 발생

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

정상

SLURM Scheduler - Cannon - 정상

Cannon Compute Cluster (Holyoke) - 정상

Boston Compute Nodes - 정상

GPU nodes (Holyoke) - 정상

seas_compute - 정상

정상

SLURM Scheduler - FASSE - 정상

FASSE Compute Cluster (Holyoke) - 정상

정상

Kempner Cluster CPU - 정상

Kempner Cluster GPU - 정상

정상

FASSE login nodes - 정상

정상

Cannon Open OnDemand - 정상

FASSE Open OnDemand - 정상

심각한 장애

Netscratch (Global Scratch) - 정상

Home Directory Storage - Boston - 정상

Tape - (Tier 3) - 정상

Holylabs - 정상

Isilon Storage Holyoke (Tier 1) - 정상

Holystore01 (Tier 0) - 정상

HolyLFS04 (Tier 0) - 정상

HolyLFS05 (Tier 0) - 정상

HolyLFS06 (Tier 0) - 심각한 장애

Holyoke Tier 2 NFS - 정상

Holyoke Specialty Storage - 정상

holECS - 정상

Isilon Storage Boston (Tier 1) - 정상

BosLFS02 (Tier 0) - 정상

Boston Tier 2 NFS - 정상

CEPH Storage Boston (Tier 2) - 정상

Boston Specialty Storage - 정상

bosECS - 정상

Samba Cluster - 정상

Globus Data Transfer - 정상

8월 2022

8월22
NESE tape (Tier 3) upgrades
완료됨유지보수106시간 43분
  • 완료됨8월 26, 2022 · 20:43UTC

    Maintenance has completed successfully.

  • 진행 중8월 22, 2022 · 10:00UTC

    Maintenance is now in progress

  • 계획됨8월 22, 2022 · 10:00UTC

    Our tier 3 tape system is part of and run by NESE (the NorthEast Storage Exchange).

    We have been informed that they will be performing a significant upgrade of their Spectrum Scale archive system starting August 15th. This is a multi-day upgrade and will take approximately 3 days (potential for longer). Tier 3 tape allocations will be unavailable during this upgrade.

    NESE has informed us that this maintenance will be deferred to next week (9/22/22).

7월 2022

7월21
NESE tape (Tier 3) hardware maintenance/install
완료됨유지보수12시간
  • 완료됨7월 21, 2022 · 22:00UTC

    Maintenance has completed successfully

  • 진행 중7월 21, 2022 · 10:00UTC

    Maintenance is now in progress

  • 계획됨7월 21, 2022 · 10:00UTC

    Our tier 3 tape system is part of and run by NESE (the NorthEast Storage Exchange).

    We have been informed that they will be installing additional tape drives to the system on July 21st and this will require a whole day downtime to accomplish. Tier 3 tape archives will not be available to our users on that date.

holylfs02 performance issues
해결됨815시간 14분
  • 해결됨UTC

    The unrepairable volume on holylfs02 is isolated to two labs and they have been informed of next steps. This issue does not affect other areas on holylfs02, so we are closing this incident.

  • 업데이트UTC

    Recently we noticed an uptick in bad blocks on a RAID6 disk volume that is part of the entire filesystem. Generally speaking, the operating system will vector these out so no data is written there. During this period, we had to replace a number of drives due to failures; they are part of RAID 6 multi-disk set with dual parity and will rebuild with minimal impact on performance.

    What we believe happened is that, during the rebuild process, bad data was copied to the replacement disks and the filesystem got corrupted. One of the staff ran a read-only, non-destructive repair on the volume in question and noted quite a few errors.

    So far, we have 1) contacted the vendor (who gave us a command to clear additional bad blocks)
    2) NOT run the actual repair command to "fix" the filesystem (which would delete data) 3) contacted the vendor to see if they had any partners that might be able to assist. We are planning to meet with one of those partners early next week, but are not confident they will have a solution. At this point (and depending on how that meeting goes), the next step would be to run the repair, note the extent of loss, and attempt to get the volume remounted.

    Updates to follow when we have more information.

    Note that these shelves are covered under warranty support for another year. We see no need at present to replace the 3PB allocation with new hardware (this is planned to take place Q3-4 FY23)

  • 확인됨UTC

    Users may experience issues connecting to holylfs02, or slow samba performance.

    This is due to a hardware issue with holylfs02, and we have opened a ticket with the vendor. Updates to follow.

    No ETA.