FAS Research Computing - Cannon cluster degraded – Details zu Vorfällen

Teilweise herabgesetzte Leistung festgestellt

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Cannon cluster degraded

Gelöst
Beeinträchtigte Leistung
Aufgetreten am vor fast 2 JahrenDauerte etwa 5 Stunden

Betroffen

Cannon Cluster

Beeinträchtigte Leistung aus 2:22 PM zu 7:19 PM

SLURM Scheduler - Cannon

Beeinträchtigte Leistung aus 2:22 PM zu 7:19 PM

Cannon Compute Cluster (Holyoke)

Beeinträchtigte Leistung aus 2:22 PM zu 7:19 PM

Boston Compute Nodes

Beeinträchtigte Leistung aus 2:22 PM zu 7:19 PM

GPU nodes (Holyoke)

Beeinträchtigte Leistung aus 2:22 PM zu 7:19 PM

seas_compute

Beeinträchtigte Leistung aus 2:22 PM zu 7:19 PM

Aktualisierung
  • Gelöst
    Gelöst
    The power issue has been resolved. All nodes that were drained are now being re-opened.
  • Analyse
    Analyse

    Due to temporary power availability issues in MGHPCC, half the nodes in 8A have been set to drain. This affects all partitions. Jobs will take longer to schedule but will not be terminated.

    We will reopen these nodes once the power issue has been resolved at the datacenter. No ETA at this time