FAS Research Computing - MGHPCC network maintenance Tuesday Sept 27, 2022 6-8 PM – Wartungsdetails

Teilweise herabgesetzte Leistung festgestellt

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

MGHPCC network maintenance Tuesday Sept 27, 2022 6-8 PM

Abgeschlossen
Geplant für September 27, 2022 um 22:00 – September 28, 2022 um 00:00

Auswirkungen

Networking

Wartung aus 10:00 PM zu 12:00 AM

Network - Holyoke/MGHPCC

Wartung aus 10:00 PM zu 12:00 AM

Holyoke-Boston fiber link (short path)

Wartung aus 10:00 PM zu 12:00 AM

Holyoke-Boston fiber link (long path)

Wartung aus 10:00 PM zu 12:00 AM

Aktualisierung
  • Abgeschlossen
    September 28, 2022 um 00:00
    Abgeschlossen
    September 28, 2022 um 00:00

    Maintenance has completed successfully

  • In Bearbeitung
    September 27, 2022 um 22:00
    In Bearbeitung
    September 27, 2022 um 22:00

    Maintenance is now in progress

  • Geplant
    September 27, 2022 um 22:00
    Geplant
    September 27, 2022 um 22:00

    VPN UPDATE This maintenance has been extended to accommodate an VPN update from 6-7PM. The FASRC VPN will deprecate older, less-secure ciphers. VPN connections could drop during this update.

    FIBRE UPDATE As part of the 100Gb link upgrade, networking maintenance will occur at the MGHPCC/Holyoke data center Tuesday Sept 27, 200 starting at 7PM. We are setting aside one hour for this but, barring any issues, the updates should not take that long.

    Any interruption should be very brief. However, as always the possibility does exist for knock-on issues. We will post any updates here and FASRC staff will be monitoring for any related issues.