FAS Research Computing - Power Loss at MGHPCC – تفاصيل الحادثة

أداء متدهور جزئيًا

Status page for the Harvard FAS Research Computing cluster and other resources.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
Documentation: https://docs.rc.fas.harvard.edu | Account Portal https://portal.rc.fas.harvard.edu
Email: rchelp@rc.fas.harvard.edu | Support Hours


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Power Loss at MGHPCC

تم الحل
انقطاع كبير
بدأ في منذ سنة واحدة تقريباًاستمر ساعتين تقريبا

متأثر

Cannon Cluster

جاهز للعمل من 11:02 AM ألى 12:41 PM

SLURM Scheduler - Cannon

جاهز للعمل من 11:02 AM ألى 12:41 PM

Cannon Compute Cluster (Holyoke)

جاهز للعمل من 11:02 AM ألى 12:41 PM

Boston Compute Nodes

جاهز للعمل من 11:02 AM ألى 12:41 PM

GPU nodes (Holyoke)

جاهز للعمل من 11:02 AM ألى 12:41 PM

seas_compute

جاهز للعمل من 11:02 AM ألى 12:41 PM

التحديثات
  • تم الحل
    تم الحل

    Most nodes have been returned to service, both Cannon and FASSE are operable. Remaining down nodes will be remediated by FASRC staff over the next several days.

  • تحقيق
    تحقيق

    At 1:05am EDT MGHPCC lost power to compute due to cooling failure. The chiller has been restored and power is back as of 5:43am. As a result of this all compute is powered off and all running jobs were requeued. FASRC staff is triaging the down hardware and will bring it back online when it is ready. Jobs will start once FASRC staff have confirmed that everything is in good state.